Follow us :

Post Tension Metal Duct for Prestressed Concrete Projects

Post Tension Metal Duct for Prestressed Concrete Projects
Post Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete Projects
group name
Plastic Corrugated Duct
Min Order
1000 meter
brand name
Chunpeng PC Wire and PC Strand
model
flat
Nearest port for product export
Tianjin xingang, Qingdao
Delivery clauses under the trade mode
FOB, CFR, CIF
Acceptable payment methods
T/T, L/C
update time
Wed, 03 Mar 2021 17:46:18 GMT

Paramtents

  • Certification Metal Duct

  • Type Metal Building Materials

  • Feature Corrosion Resistant

  • Size Customized Size

  • Application Industry

  • Shape Round/Flat

Packging & Delivery

  • Min Order1000 meter

Briefing

Chunpeng corrugated metal duct is mainly used as the prestressed concrete structure.

Detailed

Post Tension Metal Duct for Prestressed Concrete Projects

Product Overviews

Post Tension Metal Duct for Prestressed Concrete Projects

 

1. Type: Round and Flat Metal ducts;

2. Surface: Galvanized;

3. Thickness: 0.25-0.35mm

4. Dia.: 35mm-130mm;

5. Length: 2.2M/PCS,5.8M/PCS

6. Application: It's mainly used as the prestressed concrete structure, such as the large span railway and highway, bridge, crane girders, rock-soil anchoring engineering, multi-floor industrual plant, coal, sports venues. etc.

HDPE Corrugated production and pipe detail :

 

 http://..........cn/contact-us.htm http://..........cn/contact-us.htm http://..........cn/contact-us.htm

Trading Info

 MOQ

500  meters 

Grade No. Identification

English label with specifications

Transportation

in one 20' or 40'container

Trade Terms

CIF, CFR, FOB, EXW etc.

Payment

100% Irrevocable documentary L/C at sight; or 30% deposit in advance and the balance against copy B/L within 3 days

Other Payment Available

D/P at sight, Western Union, Pay Pal etc. based on the relationship of cooperation

Delivery Time

20 days after receiving the deposits or workable L/C

Shipping Time

5-30 days depend on the final destination

Quality Control

1) Raw material control

As the strategic partner and big customer of China's biggest steel company, Capital Steel Group, we have stable suppliers and high quality raw materials.

2) ISO9001: 2000 certificate

All of our equipments, production flow, and quality control system have passed ISO9001: 2000 certificate since 1997.

3) Strict product test

There are 260 employees in our company, including 35 experts with engineer titles. We have 3 test laboratories, 15 quality control commissioners and 11 workshops to ensure the accomplishment of the export orders.